Analysis of the impact of pile foundation work in an office building construction project in Bangkok
Main Article Content
Abstract
Construction projects involve numerous interrelated activities, where the quality of earlier tasks directly affects subsequent stages. This study aims to investigate the impact of prior construction activities, focusing on pile foundation work in an office building project in Bangkok. The case study included 54 bored piles, which were assessed using the Seismic Integrity Test in accordance with ASTM D5882-00 standards. The results showed that 53 piles (98.15%) were structurally sound, while 11 piles (20.37%) were misaligned beyond acceptable tolerance. This misalignment required a redesign of the foundation, resulting in an additional cost of 96,751.92 Baht and a 10-day delay (equivalent to 3.70%) in the construction schedule. As construction involves many sequential tasks, inadequate quality in early stages can increase costs, delay timelines, and lead to financial losses and contractual penalties. Therefore, contractors should emphasize effective on-site management, including thorough inspections before and during construction, with supervisory personnel reviewing site engineers’ work to minimize errors and enhance overall quality.
Downloads
Article Details

This work is licensed under a Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.
The articles published in the Journal of Architecture, Design and Construction are the intellectual property of the Faculty of Architecture, Urban Design and Creative Arts, Mahasarakham University.
References
กรมบัญชีกลาง. (2550). หลักเกณฑ์การกำหนดราคากลางงานก่อสร้างของทางราชการ. กรุงเทพมหานคร: กรมบัญชีกลาง.
กองนโยบายและแผน มหาวิทยาลัยเทคโนโลยีราชมงคลพระนคร. (2564). รายการข้อกำหนดงานเสาเข็มเจาะแห้ง. กรุงเทพมหานคร: กองนโยบายและแผน.
กัลยา จันทรกรัด. (2007). ข้อผิดพลาดของแบบก่อสร้างและรายการประกอบแบบที่ส่งผลกระทบต่อผลิตภาพของผู้รับเหมาในโครงการประเภทที่พักอาศัย [วิทยานิพนธ์วิศวกรรมศาสตรมหาบัณฑิต, สถาบันเทคโนโลยีพระจอมเกล้าพระนครเหนือ].
จรุงศรี โพธิ์กลาง. (2016). การศึกษาปัจจัยที่มีผลต่อความล่าช้าในงานตอกเสาเข็มโครงการก่อสร้างศูนย์เมล็ดพันธุ์ข้าว [วิทยานิพนธ์วิศวกรรมศาสตรมหาบัณฑิต, มหาวิทยาลัยเทคโนโลยีสุรนารี].
ชายรอง กิมเฮียะ และ อุดมวิทย์ ไชยสกุลเกียรติ. (2020). ปัจจัยที่มีผลกระทบต่อความล่าช้าของงานก่อสร้าง: กรณีศึกษาโครงการรถไฟฟ้าสายสีชมพู (แคราย–มีนบุรี). ใน เอกสารประกอบการประชุมวิชาการวิศวกรรมโยธาแห่งชาติ ครั้งที่ 25: วิศวกรรมโยธากับโครงการเขตพัฒนาพิเศษภาคตะวันออกเพื่อการพัฒนาอย่างยั่งยืน (หน้า 268–273). ชลบุรี: มหาวิทยาลัยเกษตรศาสตร์ วิทยาเขตศรีราชา.
บริษัท เอส.เค.อี คอนซัลเตนท์ จำกัด. (2563). เอกสารรายงานผลการทดสอบความสมบูรณ์ของเสาเข็มเจาะโครงการก่อสร้างอาคารเอนกประสงค์ มหาวิทยาลัยเทคโนโลยีราชมงคลพระนคร. กรุงเทพมหานคร: บริษัท เอส.เค.อี คอนซัลเตนท์ จำกัด.
วรานนท์ คงสง และ ชัยวัฒน์ ภู่วรกุลชัย. (2019). มูลเหตุของความล่าช้าในโครงการโดยการวิเคราะห์ดัชนีความสำคัญสัมพันธ์. วารสารวิชาการพระจอมเกล้าพระนครเหนือ, 29(2), 270–281.
วิศวกรรมสถานแห่งประเทศไทยในพระบรมราชูปถัมภ์. (2546). ข้อกำหนดมาตรฐานสำหรับงานก่อสร้างเสาเข็มเจาะ. กรุงเทพมหานคร: วิศวกรรมสถานแห่งประเทศไทยในพระบรมราชูปถัมภ์.
วิศวกรรมสถานแห่งประเทศไทยในพระบรมราชูปถัมภ์. (2548). แนวทางการวัดปริมาณงานก่อสร้างอาคาร. กรุงเทพมหานคร: วิศวกรรมสถานแห่งประเทศไทยในพระบรมราชูปถัมภ์.
สุนันท์ มนต์แก้ว, ธวัชชัย นวเลิศปัญญา และ วรรณวิทย์ แต้มทอง. (2015). ผลิตภาพแรงงานของงานฉาบปูนผนังภายนอกอาคาร. วารสารวิชาการพระจอมเกล้าพระนครเหนือ, 25(2), 203–210.
Abdel Wahab, M., Ibrahim, A., Ghatass, H., & Abdel Galil, E. (2018). Factors affecting the cost of construction materials in Egypt. Port Said Engineering Research Journal, 22(1), 82–89. https://doi.org/10.21608/pserj.2018.32469
Alaghbari, W., Al-Sakkaf, A. A., & Sultan, B. (2019). Factors affecting construction labour productivity in Yemen. International Journal of Construction Management, 19(1), 79–91. https://doi.org/10.1080/15623599.2017.1382091
Bhattarai, M. (2023). Causes of delay in construction projects in Nepal. Saudi Journal of Engineering and Technology, 8(6), 108–114. https://doi.org/10.36348/sjet.2023.v08i06.001
Chavan, S., & Salunkha, H. (2013). A study on labor productivity in construction industry. International Journal of Engineering Research, 5(1), 247–249.
Dinh, T. H., & Nguyen, V. T. (2019). Analysis of affected factors on construction productivity in Vietnam. International Journal of Civil Engineering and Technology, 10(2), 854–864. Retrieved from https://www.academia.edu/40159710/ANALYSIS_OF_AFFECTED_FACTORS_ON_CONSTRUCTION_PRODUCTIVITY_IN_VIETNAM
El-Gohary, K., & Aziz, R. (2014). Factors influencing construction labor productivity in Egypt. Journal of Management in Engineering, 30(1), 1–9. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000168
Flyvbjerg, B. (2014). What you should know about megaprojects and why: An overview. Project Management Journal, 45(2), 6–19. https://doi.org/10.1002/pmj.21409
Ghoddousi, P., Poorafshar, O., Chileshe, N., & Hosseini, M. R. (2015). Labour productivity in Iranian construction projects. International Journal of Productivity and Performance Management, 64(6), 811–830. https://doi.org/10.1108/IJPPM-01-2014-0018
Hwang, B.-G., Zhu, L., & Tan, J. T. T. (2016). Factors affecting productivity in green building construction projects: The case of Singapore. Journal of Management in Engineering, 33(3), 04016052. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000499
Ibrahim, M. (2013). Principal factors impacting labor productivity of public construction projects in Palestine: Contractors’ perspective. International Journal of Architecture, Engineering and Construction, 2(3), 194–202.
Jarkas, A. M., Kadri, C. Y., & Younes, J. H. (2012). A survey of factors influencing the productivity of construction operatives in the State of Qatar. International Journal of Construction Management, 12(3), 1–23. https://doi.org/10.1080/15623599.2012.10773192
Jarkas, A., & Bitar, C. (2012). Factors affecting construction labor productivity in Kuwait. Journal of Construction Engineering and Management, 138(7), 811–820. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000501
Rahman, I. A., Memon, A. H., Memon, A. Q., Shaikh, M. A., & Siddiqui, F. (2019). Factors affecting the labour productivity in construction projects of Pakistan. MATEC Web of Conferences, 266, 05010. https://doi.org/10.1051/matecconf/201926605010
Rashid, Y. (2020). Analysis of delay factors and their effects on construction projects. Management Science Letters, 10(6), 1197–1204. https://doi.org/10.5267/j.msl.2019.11.034
Saurav, D., Satya, N., Joseph, V., & Kinshuk, S. (2019). Study of significant factors affecting construction productivity using relative importance index in Indian construction industry. E3S Web of Conferences, 140(2019), 1–7. https://doi.org/10.1051/e3sconf/201914001004
Senouci, A., Ismail, A., & Eldin, N. (2016). Time delay and cost overrun in Qatari public construction projects. Procedia Engineering, 164, 368–375. https://doi.org/10.1016/j.proeng.2016.11.632
Viles, E., Rudeli, N. C., & Santilli, A. (2020). Causes of delay in construction projects: A quantitative analysis. Engineering. Construction and Architectural Management, 27(4), 917–935.